Stellar Aluminium windows and doors from Epwin Window Systems were selected for four impressively built new build properties in the picturesque village of Lindsell in Dunmow, Essex.
Built on the site of a former chicken farm, the four luxury detached homes, located on a gated private road, were constructed by JGA Services Ltd. The three and four bedroom properties feature the highest specification throughout, with all windows and doors manufactured to exacting standards.
The new build project was awarded to experienced Stellar fabricator Prestige Aluminium Essex Ltd and installed by local installer V. Fullalove Installations Ltd. In total, fifty Stellar windows, six Stellar bifolds and two residential doors were precision-manufactured for the project.
Energy efficiency was a key feature of the new build project, with the properties incorporating air source heating pumps and multi-zone underfloor heating control throughout. Stellar windows and doors are energy efficient by design, offering superior thermal efficiency, which meant they met the exacting project’s specifications.
The aesthetics of the windows and doors were also a key consideration and were manufactured to complement the timber-clad properties and harmoniously blend with the countryside setting. The system’s external flush window option was chosen to deliver a sleek, understated aesthetic. Two plots were fitted with Anthracite Grey on white windows and doors, whilst the other two were finished in RAL 6013 Reed Green to bring individual character to the properties. All Stellar profiles were powder-coated at Epwin Window Systems state-of-the-art paint plant, ensuring exacting standards were met.
As an experienced fabricator, the Prestige Aluminium Essex team is familiar with the exacting requirements of luxury new build developments. The team worked closely with the installer and main developer on site to ensure the window and doors were manufactured and delivered in line with the timescales required, with little margin for variation.
The new build project took twelve months to complete and has resulted in a luxury development with Stellar windows and doors enhancing its appeal.